Difference between revisions of "Oldwiki.scinet.utoronto.ca:System Alerts"

From oldwiki.scinet.utoronto.ca
Jump to navigation Jump to search
Line 10: Line 10:
 
|[[File:up.png|up|link=GPC Quickstart]][[GPC Quickstart|GPC]]
 
|[[File:up.png|up|link=GPC Quickstart]][[GPC Quickstart|GPC]]
 
|[[File:up.png|up|link=TCS Quickstart]][[TCS Quickstart|TCS]]
 
|[[File:up.png|up|link=TCS Quickstart]][[TCS Quickstart|TCS]]
|[[File:down.png|down|link=Sandy]][[Sandy]]
+
|[[File:up.png|down|link=Sandy]][[Sandy]]
|[[File:down.png|down|link=GPU Devel Nodes]][[GPU Devel Nodes|ARC]]
+
|[[File:up.png|down|link=GPU Devel Nodes]][[GPU Devel Nodes|ARC]]
 
|[[File:up.png|up]]File System
 
|[[File:up.png|up]]File System
 
|-
 
|-
|[[File:down.png|down|link=Gravity]][[Gravity]]
+
|[[File:up.png|down|link=Gravity]][[Gravity]]
 
|[[File:up.png|down|link=P7 Linux Cluster]][[P7 Linux Cluster|P7]]
 
|[[File:up.png|down|link=P7 Linux Cluster]][[P7 Linux Cluster|P7]]
 
|[[File:down.png|down|link=BGQ]][[BGQ]]
 
|[[File:down.png|down|link=BGQ]][[BGQ]]

Revision as of 09:42, 10 September 2014

System Status

upGPC upTCS downSandy downARC upFile System
downGravity downP7 downBGQ upHPSS


Wed Sep 10 02:50:50 EDT: Scheduler had to be shutdown, reconfigured and restarted at about 1:20AM to resolve problems related to its upgrade. Unfortunately, this killed most/all running jobs

Tue Sep 9 21:11:21 EDT: login nodes now up. Check system availability dashboard above. In particular, job submission currently not working on BGQ so it is marked down for now.

Tue Sep 9 16:24:21 EDT: Systems will likely not be available before 8PM today. Transformer maintenance has been completed but waiting for power utility to reconnect us (expected ~4:30). Unfortunately, there will be an unanticipated delay as we've been told the chiller may take 2 hrs to restart and we can't bring up systems without cooling.


On Tuesday September 9 ,2014, the SciNet datacentre will be down for maintenance. The electrical transformers that feed the datacentre require servicing, and the SciNet datacentre will go down at 7:30am. The shutdown is expected to last most of the day, with service resuming by 6pm.

Please note: All jobs on the GPC will be cancelled, and the queue purged. This is in order to allow us to install a new version of the Moab/Torque scheduler.

Last updated on Mon 8 Sep 2014 11:36:45 EDT

(Previous messages)