Difference between revisions of "Oldwiki.scinet.utoronto.ca:System Alerts"

From oldwiki.scinet.utoronto.ca
Jump to navigation Jump to search
Line 21: Line 21:
 
|}
 
|}
  
 
+
Last updated on Thu 11 Sep 2014 11:35 EDT
Wed Sep 10 02:50:50 EDT: Scheduler had to be shutdown, reconfigured and restarted at about 1:20AM to resolve problems related to its upgrade. Unfortunately, this killed most/all running jobs
 
 
 
Tue Sep  9 21:11:21 EDT: login nodes now up. Check system availability dashboard above. In particular, job submission currently not working on BGQ so it is marked down for now.
 
 
 
Tue Sep  9 16:24:21 EDT:  Systems will likely not be available before 8PM today.  Transformer maintenance has been completed but waiting for power utility to reconnect us (expected ~4:30).  Unfortunately, there will be an unanticipated delay as we've been told the chiller may take 2 hrs to restart and we can't bring up systems without cooling.
 
 
 
 
 
On Tuesday September 9 ,2014, the SciNet datacentre will be down for maintenance.  The electrical transformers that feed the datacentre require servicing, and the SciNet datacentre will go down at 7:30am.  The shutdown is expected to last most of the day, with service resuming by 6pm.
 
 
 
Please note:  All jobs on the GPC will be cancelled, and the queue purged.  This is in order to allow us to install a new version of the Moab/Torque scheduler.
 
 
 
Last updated on Mon  8 Sep 2014 11:36:45 EDT
 
  
 
([[Previous_messages:|Previous messages]])
 
([[Previous_messages:|Previous messages]])

Revision as of 11:15, 11 September 2014

System Status

upGPC upTCS downSandy downARC upFile System
downGravity downP7 downBGQ upHPSS

Last updated on Thu 11 Sep 2014 11:35 EDT

(Previous messages)