Difference between revisions of "Oldwiki.scinet.utoronto.ca:System Alerts"

From oldwiki.scinet.utoronto.ca
Jump to navigation Jump to search
Line 22: Line 22:
  
 
Sat Feb  7 15:11:27 EST 2015: GPC and storage is back now.  We are working on getting TCS and BGQ up.
 
Sat Feb  7 15:11:27 EST 2015: GPC and storage is back now.  We are working on getting TCS and BGQ up.
 +
 
Sat Feb  7 13:04:53 EST 2015: cooling has been restored. Some systems (GPC and storage) likely back mid-afternoon. Please check back later
 
Sat Feb  7 13:04:53 EST 2015: cooling has been restored. Some systems (GPC and storage) likely back mid-afternoon. Please check back later
 +
 
Sat Feb  7 11:00:20 EST 2015: primary chilled water pump won't restart. Waiting for technician. May be noon before root cause is understood. Systems unlikely to be back before 2PM at very earliest.
 
Sat Feb  7 11:00:20 EST 2015: primary chilled water pump won't restart. Waiting for technician. May be noon before root cause is understood. Systems unlikely to be back before 2PM at very earliest.
 +
 
Sat Feb  7 10:02:02 EST 2015: staff onsite. Assessing problem
 
Sat Feb  7 10:02:02 EST 2015: staff onsite. Assessing problem
 +
 
Sat Feb  7 07:00:14 EST 2015:  <span style="color:red">datacenter shutdown automatically due to a power outage</span>
 
Sat Feb  7 07:00:14 EST 2015:  <span style="color:red">datacenter shutdown automatically due to a power outage</span>
  

Revision as of 14:25, 8 February 2015

System Status

upGPC upTCS upSandy upARC upFile System
upGravity upP7 upBGQ upHPSS

Sat Feb 7 15:11:27 EST 2015: GPC and storage is back now. We are working on getting TCS and BGQ up.

Sat Feb 7 13:04:53 EST 2015: cooling has been restored. Some systems (GPC and storage) likely back mid-afternoon. Please check back later

Sat Feb 7 11:00:20 EST 2015: primary chilled water pump won't restart. Waiting for technician. May be noon before root cause is understood. Systems unlikely to be back before 2PM at very earliest.

Sat Feb 7 10:02:02 EST 2015: staff onsite. Assessing problem

Sat Feb 7 07:00:14 EST 2015: datacenter shutdown automatically due to a power outage

Thu Jan 22 13:27:44 EST 2015: BGQ now available as a single 4-rack system. bgqdev-fen1 is the single login/devel/submission node.

(Previous messages)