Difference between revisions of "Oldwiki.scinet.utoronto.ca:System Alerts"
Jump to navigation
Jump to search
m (→System Status) |
m (→System Status) |
||
Line 4: | Line 4: | ||
[[File:up.png|up|link=GPU Devel Nodes]]ARC | [[File:up.png|up|link=GPU Devel Nodes]]ARC | ||
[[File:up.png|up|link=P7 Linux Cluster]]P7 | [[File:up.png|up|link=P7 Linux Cluster]]P7 | ||
− | [[File: | + | [[File:up75.png|devel sys down, production sys up|link=BGQ]]BGQ |
[[File:up.png|up|link=HPSS]]HPSS | [[File:up.png|up|link=HPSS]]HPSS | ||
Revision as of 10:59, 18 March 2013
System Status
BGQdev system will be taken down on Monday 18 March at 9:00 am for proactive maintenance. We hope to have it back by end of Tuesday. The BGQ production system will be shutdown on Tuesday 19 March at 9:00 am for the same reason. We hope to have it back by the end of Thursday.
There is a possibility that either or both systems could have an extra day's delay. Check back here for updates.
Other SciNet systems should not be affected.
Last updated: Sun Mar 17 22:15:55 EDT 2013
(Previous messages)