Difference between revisions of "Oldwiki.scinet.utoronto.ca:System Alerts"

From oldwiki.scinet.utoronto.ca
Jump to navigation Jump to search
Line 16: Line 16:
 
|[[File:up.png|up|link=Gravity]][[Gravity]]
 
|[[File:up.png|up|link=Gravity]][[Gravity]]
 
|[[File:up.png|up|link=P7 Linux Cluster]][[P7 Linux Cluster|P7]]
 
|[[File:up.png|up|link=P7 Linux Cluster]][[P7 Linux Cluster|P7]]
|[[File:up75.png|up|link=BGQ]][[BGQ]]
+
|[[File:up.png|up|link=BGQ]][[BGQ]]
 
|[[File:up.png|up|link=HPSS]][[HPSS]]
 
|[[File:up.png|up|link=HPSS]][[HPSS]]
 
|
 
|
 
|}
 
|}
  
Wed Aug 27 15:44:00 EDT 2014: Issue with a node board on the production system : full system jobs cannot run until the node is fixed.
 
  
 
On August 21, 2014, at 00:30am, there will be a 15 minute period during which maintenance on our gateway switch must be conducted.  As a result you may not be able to contact the datacentre.  No jobs will be affected by this.
 
On August 21, 2014, at 00:30am, there will be a 15 minute period during which maintenance on our gateway switch must be conducted.  As a result you may not be able to contact the datacentre.  No jobs will be affected by this.

Revision as of 10:30, 28 August 2014

System Status

upGPC upTCS upSandy upARC upFile System
upGravity upP7 upBGQ upHPSS


On August 21, 2014, at 00:30am, there will be a 15 minute period during which maintenance on our gateway switch must be conducted. As a result you may not be able to contact the datacentre. No jobs will be affected by this.


Note: As a precaution, emails by the Moab/Torque scheduler have been disabled because of a potential security vulnerability since Jan 24th 2014.

Last updated on Wed Aug 20 11:19:21 EDT 2014

(Previous messages)